We Build Projects That Last
Waters Edge project consists of two (3) 3-story apartment buildings (designated as buildings 1, 2, and 3) and (1) 2-story apartment building. The 2-story building 4 includes private garages on the 1st floor. It also includes a clubhouse structure and (3) small stand-alone private garage structures with an open side.
Ground up & New Development
30,000 Sq. Ft.
PROJECT DETAILS
Bloomington, IN
Water's Edge Apartments
PROJECTS
Carmel Clay Public Library project involved a 2-story addition at the front of the existing building, as well as a second level connector to a new 3-story open parking garage to the south. The project also included significant interior renovations throughout. An addition of 7,975 sq. ft. was added to the first floor, and 5,370 sq. ft to the second floor. The addition includes a north-south gallery, a large meeting room, a new digital media lab, and additional stacks and reading room space.
PROJECT DETAILS
Addition & Renovation
13,500 Sq. Ft. Addition
33,000 Sq. Ft. Parking Garage
Carmel Clay Library
Carmel, IN
A new interior build-out for Freddy's Frozen Custard and Steakburgers restaurant in a former mercantile tenant space. The work included demolition of non-structural components, a new drive-thru, vestibule and "walk-in" additions. The interior build-out also includes a new dining area, restrooms, kitchen, exhaust hoods, and manager's office.